Ace ACM Home

Category

Asbestos Compliance

15 articles

Make-Safe Is Not Make-Clear: Asbestos Control in Damaged Buildings

Make-Safe Is Not Make-Clear: Asbestos Control in Damaged Buildings

Fire, flood and impact damage create a predictable race: the building is made safe before anyone has read the asbestos register. This article sets out how dutyholders can keep the legal duty intact, sequence verification ahead of demolition and drying, and keep insurers, loss adjusters and contractors inside the same record.

Twelve Months, One Register: A Dutyholder’s Asbestos Rhythm for 2026

Twelve Months, One Register: A Dutyholder’s Asbestos Rhythm for 2026

An asbestos management plan only works when its recurring tasks are scheduled, owned and reviewed. This article sets out a practical annual rhythm for UK dutyholders in 2026, linking register checks, condition inspections, contractor controls and waste traceability to seasonal building risks.

New Occupancy, Old Fabric: Rebaselining Asbestos Duty After a UK Change of Use

New Occupancy, Old Fabric: Rebaselining Asbestos Duty After a UK Change of Use

A change of use can alter who controls premises, how they are accessed, and what works are planned long before new occupants arrive. This article sets out how UK dutyholders should reassess asbestos information, commission refurbishment or demolition surveys where needed, and close the compliance gap between planning consent and occupation.

Common Parts, Clear Lines: Asbestos Duty in UK Shared Residential Buildings

Common Parts, Clear Lines: Asbestos Duty in UK Shared Residential Buildings

Communal corridors, risers and plant rooms in UK blocks often contain asbestos, but responsibility can drift between freeholder, managing agent and residents’ management company. This article sets out a practical method for naming the dutyholder, capturing common-part ACMs in the register and keeping contractor access accountable in 2026.

After the Certificate: Auditing the Asbestos Waste Paper Trail in 2026

After the Certificate: Auditing the Asbestos Waste Paper Trail in 2026

Clearance certificates confirm that an area has been cleaned, not that asbestos waste was lawfully transported and received. This desk-based audit guide explains how UK dutyholders can use consignment notes, carrier registrations and consignee permits to test whether the removal paperwork matches the job actually done.

Designing Out the Unknown: Asbestos Information Duties for Principal Designers in 2026

Designing Out the Unknown: Asbestos Information Duties for Principal Designers in 2026

Principal designers cannot treat asbestos as a site-stage surprise. This article sets out how design-stage accountability under the Building Safety Act 2022 interacts with the duty to manage asbestos, and provides a practical pre-construction checklist for testing inherited registers, survey caveats and unopened voids before work starts.

Handing Back the Keys: Asbestos Accountability at Lease End

Handing Back the Keys: Asbestos Accountability at Lease End

Lease expiry can move asbestos responsibility between parties faster than the paperwork. This article sets out how landlords and tenants should audit records, check dilapidations and refurbishment clauses, and document the handover.

When the Lights Go Out: Asbestos Control in Void UK Premises

When the Lights Go Out: Asbestos Control in Void UK Premises

Vacant UK buildings still carry the duty to manage asbestos, yet inspections can lapse and damage can go unnoticed for months. This article sets out a practical void-period control plan covering access, insurer expectations and reoccupation checks.

Stop, Isolate, Record: A Contractor’s Emergency Asbestos Protocol

Stop, Isolate, Record: A Contractor’s Emergency Asbestos Protocol

An unexpected asbestos find mid-project is a controlled interruption, not a race to clear the area. This practical protocol sets out immediate work stoppage, isolation, licensed contractor engagement, register updates and the mistakes that turn a manageable incident into a regulatory problem.

Beyond the Licence: Why NNLW Classification Still Catches UK Dutyholders Out

Beyond the Licence: Why NNLW Classification Still Catches UK Dutyholders Out

Notifiable non-licensed work is not a paperwork formality; it is a classification decision that must be evidenced before work starts. This article sets out where cement, textured coating and gasket jobs commonly slip between categories, and what an inspector will expect to see in the compliance trail.